3 Schools for Eagle Mtn. - Saginaw ISD
Contract Amount:
$1,275,000
Mechanical Designer:
RH George
Architect:
VLK Architects
General Contractor:
Walker Building Corp
5 Arlington Elementary Schools
Contract Amount:
$329,950
Mechanical Designer:
Friberg Associates
Architect:
Friberg Associates
General Contractor:
Century Mechanical
Academy at Nola Dunn - Burleson ISD
Contract Amount:
$2,472,178
Mechanical Designer:
SHW Group
Architect:
SHW Group
General Contractor:
Charter Builders, Inc.
Completion Date:
August 2010
Acton Elementary School - Granbury ISD
Contract Amount:
$605,525
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Huckabee & Associates
General Contractor:
Douglas Barnhart, Inc.
Administrative & Welcome Center - Crowley ISD
Contact:
Chad Kroeker
AISD Elementary School
Contract Amount:
$487,745
Mechanical Designer:
Walter Cash & Partners
Architect:
Wharton & Lam
General Contractor:
Ed A. Wilson, Inc.
Aledo ISD Elementary School #5
Contract Amount:
$3,590,685
General Contractor:
Buford Thompson
Completion Date:
August 2017
Contact:
John Heiser
Aledo ISD HVAC Upgrades (Aledo MS & Vandergriff ES)
General Contractor:
Trane
Contact:
John Heiser
Aledo ISD McAnally Intermediate School Upgrades
General Contractor:
Aledo ISD
Contact:
John Heiser
Aledo Middle School
Contract Amount:
$235,575
Mechanical Designer:
Eisenbeck
Architect:
Welch & Hampton
General Contractor:
KA Sparks Contractor
Alice Ponder Elementary - Mansfield ISD
Contract Amount:
$2,471,000
Mechanical Designer:
Image Engineering Group
Architect:
Huckabee
General Contractor:
Lee Lewis Construction Company
All Saints Episcopal School - Early Childhood Development Center
Contract Amount:
$397,622
Mechanical Designer:
Baird, Hampton & Brown
Architect:
Hanfeld Hoffer Stanford
General Contractor:
Steele & Freeman Inc.
Completion Date:
May 2013
All Saints Episcopal School - Upper School
Contract Amount:
$1,803,208
Mechanical Designer:
Baird, Hampton, Brown
Architect:
Hahnfeld, Hoffer, Stanford
General Contractor:
Steele Freeman, Inc.
Armetha Norris Elementary School - Frisco ISD
Contract Amount:
$2,276,100
Mechanical Designer:
Image Engineering Group
Architect:
Corgan
General Contractor:
CORE Construction
Completion Date:
May 2015
Arnold Middle School - Grand Prairie ISD
Contract Amount:
$2,589,875
Mechanical Designer:
Don Penn
Architect:
PBK Architects
General Contractor:
Dal-Mac Construction
Ashley Elementary School - Frisco ISD
Contract Amount:
$1,509,669
Mechanical Designer:
Don Penn Engineers
Architect:
Corgan Associates
General Contractor:
Coronado Builders
Atherton Elementary School
Contract Amount:
$340,037
Mechanical Designer:
Love, Friberg
Architect:
Geren Associates
General Contractor:
Pete Durant & Associates
Austin Elementary School - Grand Prairie ISD
Contract Amount:
$405,550
Mechanical Designer:
Don Penn
Architect:
PBK Architects
General Contractor:
Dal-Mac Construction
Bell Manor Elementary - HEB ISD
Contract Amount:
$595,576
Mechanical Designer:
Turner Engineers
Architect:
Hahnfeld Associates
General Contractor:
Steele-Freeman, Inc.
Ben Barber CTA Additions
Contract Amount:
$1,775,000
Mechanical Designer:
Romine Romine and Burgess
Architect:
Huckabee
General Contractor:
Ratcliff Constructors
Completion Date:
August 2016
Contact:
Nathan Livingston
Bette Perot Elementary School - Keller ISD
Contract Amount:
$1,585,835
Mechanical Designer:
Maloney Associates
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Birdville Elementary
Contract Amount:
$349,900
Mechanical Designer:
Don Penn Associates
Architect:
SHW Group
General Contractor:
Century Mechanical
Birdville High School
Contract Amount:
$5,299,750
Mechanical Designer:
Don Penn
Architect:
SHW Group
General Contractor:
Charter Builders
Birdville ISD-Northride, Hardeman Schools
Contract Amount:
$761,100
Mechanical Designer:
Image Engineering
Architect:
Image Engineering
General Contractor:
Century Mechanical Contractors
Blue Haze Elementary - White Settlement ISD
Contract Amount:
$2,271,249
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
August 2007
Boals Elementary School - Frisco ISD
Contract Amount:
$944,471
Mechanical Designer:
Don Penn
Architect:
Corgan Associates
General Contractor:
Cadence McShane Corp.
Boswell Gymnasium
Contract Amount:
$248,889
Mechanical Designer:
Romine & Romine
Architect:
Parker/Croston Partnership
General Contractor:
Smithfield Construction
Boswell High School Renovations
Contract Amount:
$1,267,864
Mechanical Designer:
R H George
Architect:
VLK Architects
General Contractor:
Reeder General Contractors
Completion Date:
September 2009
Bowie Middle School Additions & Renovations - Irving ISD
Contract Amount:
$4,122,350
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates
General Contractor:
Charter Builders
Completion Date:
December 2011
Brewer High School - Additions & Renovations
General Contractor:
BTC
Contact:
Chad Kroeker
Brewer High School - White Settlement ISD
Contract Amount:
$11,693,873
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
December 2008
Bridgeport High School
Contract Amount:
$798,836
Mechanical Designer:
Campos Engineering
Architect:
Claycomb Associates
General Contractor:
DSA, Inc.
Bryson Elementary
Contract Amount:
$601,110
Mechanical Designer:
Lawrence White
Architect:
Buford & Work, Inc.
General Contractor:
NUCO Industries, Inc.
Burleson High School
Contract Amount:
$323,375
Mechanical Designer:
Eisenbeck
Architect:
Welch & Hampton
General Contractor:
Smithfield Construction
Burleson High School Admin Addition - Burleson ISD
Contract Amount:
$150,700
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Huckabee & Associates
General Contractor:
Charter Builders
Completion Date:
August 2010
Burleson STEAM Middle School
Contract Amount:
$621,450
Mechanical Designer:
Image Engineering Group, Ltd.
Architect:
Stantec
General Contractor:
Balfour Beatty Construction
Contact:
Chad Kroeker
Byrd, Reed, Kennemer Middle Schools Duncanville ISD
Contract Amount:
$679,948
Mechanical Designer:
Estes, McClure Associates
Architect:
SHW Group
General Contractor:
Hunt Construction
Byron Nelson High School - Northwest ISD
Contract Amount:
$12,923,528
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Charter Builders, Inc.
Completion Date:
August 2009
Caprock Elementary - Keller ISD
Contract Amount:
$2,119,366
Mechanical Designer:
Image Engineering
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Completion Date:
August 2009
Career & Tech Building - Frisco ISD
Contract Amount:
$2,917,092
Mechanical Designer:
Image Engineering
Architect:
SHW Group
General Contractor:
Cadence McShane Inc.
Completion Date:
November 2008
Carroll Elementary/Inter.
Contract Amount:
$1,396,000
Mechanical Designer:
Wells-Doak
Architect:
Vestal-Loftis-Kalista
General Contractor:
Mitchell Enterprises
Carroll Junior High School
Contract Amount:
$2,056,900
Mechanical Designer:
Wells-Doak
Architect:
Vestal-Loftis-Kalista
General Contractor:
Buford-Thompson Inc.
Carroll Middle School - Carroll ISD
Contract Amount:
$2,775,460
Mechanical Designer:
Romine, Romine and Burgess
Architect:
Natex Architects
General Contractor:
Bartlett Cocke, LP
Completion Date:
August 2011
Carter Elementary School - NWID
Architect:
Huckabee & Associates
General Contractor:
Pogue Construction
Contact:
Jarod O'Neill
Castleberry Elementary - Castelberry ISD
Contract Amount:
$2,082,800
Mechanical Designer:
WRA
Architect:
Estes, McClure & Associates
General Contractor:
Steele Freeman Inc
Completion Date:
August 2013
Centennial High School - Burleson ISD
Contract Amount:
$14,286,195
Mechanical Designer:
Image Engineering
Architect:
SHW Group
General Contractor:
Charter Builders Inc.
Completion Date:
September 2010
Centennial High School CTE Bldg. - Frisco ISD
Contract Amount:
$164,428
Mechanical Designer:
Image Engineering
Architect:
Corgan Associates
General Contractor:
Core Construction
Completion Date:
January 2008
Central High School - Keller ISD
Contract Amount:
$5,702,403
Mechanical Designer:
Reed, Wells, Benson
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Central High School Site Work - Keller ISD
Contract Amount:
$527,776
Mechanical Designer:
Reed, Wells, Benson
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Central Middle School - Northwest ISD
Contract Amount:
$1,163,000
Mechanical Designer:
K-12 Design
Architect:
K-12 Design
General Contractor:
Diversified Construction
Cleburne High School
Contract Amount:
$246,645
Mechanical Designer:
Caffee-Sayers
Architect:
John R. Thompson Partners
General Contractor:
DSA, Inc.
Clinkscale Elementary School - Burleson ISD
Contract Amount:
$2,128,325
Mechanical Designer:
Image Engineering
Architect:
SHW Group
General Contractor:
Charter Builders Inc.
Completion Date:
December 2009
Coppell New Elementary School #5 - CISD
General Contractor:
Northstar Builders Group
Contact:
John Heiser
Corinth Primary School
Contract Amount:
$945,517
Mechanical Designer:
Don Penn Associates
Architect:
Darrow-McSpedden-Sellars
General Contractor:
Lee Lewis Construction
Country Day Lower School
Contract Amount:
$261,100
Mechanical Designer:
Schutts, Magee & Riddle
Architect:
Schutts, Magee & Riddle
General Contractor:
Linbeck Construction
Country Day School
Contract Amount:
$286,610
Mechanical Designer:
Carter Burgess, Inc.
Architect:
Geren Associates
General Contractor:
Cadenhead-Rangaire, Inc.
Covenant Christian School
Contact:
Chad Kroeker
Coy Miller Elementary School - Frisco ISD
Contract Amount:
$2,244,816
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates Inc.
General Contractor:
Cadence McShane Corp.
Completion Date:
August 2016
Contact:
Mike Beebe
Creekview Middle School - EMS ISD (Mechanical)
General Contractor:
Century Mechanical Contractors, Inc.
Contact:
Jarod O'Neill
Crestview Elementary School - Graham ISD
Contract Amount:
$223,380
Mechanical Designer:
Sam Toub & Associates
Architect:
JR Osborne Architects
General Contractor:
Marathon Contractors, Inc.
Crockett Elementary School - Grand Prairie ISD
Contract Amount:
$1,268,640
Mechanical Designer:
Don Penn & Associates
Architect:
PBK Architects
General Contractor:
Dal Mac Construction
Crowley CTE
Architect:
VLK Architects, Inc.
General Contractor:
Steele & Freeman, Inc.
Contact:
Chad Kroeker
Crowley Elementary School #17
Contact:
Chad Kroeker
Crowley High School
Contract Amount:
$1,273,101
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Geren Associates
General Contractor:
Cadenhead-Rangaire, Inc.
Crowley High School Indoor Practice Facility
General Contractor:
Steele & Freeman, Inc.
Contact:
Chad Kroeker
David Crockett Early Education - Grand Prairie ISD
Contract Amount:
$237,500
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan
General Contractor:
Lincoln Builders of Texas, Inc.
Completion Date:
August 2015
David Daniels Elementary Addition - Grand Prairie ISD
Contract Amount:
$257,650
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
August 2011
David Daniels Elementary School
Contract Amount:
$1,380,723
Mechanical Designer:
Don Penn Associates
Architect:
PBK Architects
General Contractor:
Charter Builders, Inc.
De Zavala Elementary School - Grand Prairie ISD
Contract Amount:
$1,700,000
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
August 2013
Dunbar Middle School
Contract Amount:
$838,864
Mechanical Designer:
Love, Friberg
Architect:
Dockstader Partnership
General Contractor:
Walker Construction Co.
Duncanville Central Production Kitchen
Contract Amount:
$478,890
Mechanical Designer:
Estes McClure & Assoc.
Architect:
SHW Group
General Contractor:
Hunt Construction
Duncanville High School
Contract Amount:
$7,137,691
Mechanical Designer:
Estes, McClure & Associates
Architect:
SHW Group, Inc.
General Contractor:
Hunt Construction
Durham Middle School Additions - Lewisville ISD
Architect:
Stantec Architecture, Inc.
General Contractor:
Jackson Construction
Contact:
Chad Kroeker
Eagle Mountain Elementary School #18
General Contractor:
Pogue Construction
Contact:
Drew Rome
Eagle Mountain-Saginaw Middle School
Contract Amount:
$1,570,000
Mechanical Designer:
Wells-Doak
Architect:
Vestal-Loftis-Kalista
General Contractor:
Gamma Construction
Eagle Ridge Elementary - Keller ISD
Contract Amount:
$2,090,550
Mechanical Designer:
Reed Wells Benson
Architect:
V-L-K Architects
General Contractor:
Steele-Freeman, Inc.
Completion Date:
May 2008
East Middle School - Northwest ISD
Contract Amount:
$1,163,000
Mechanical Designer:
K-12 Design
Architect:
K-12 Design
General Contractor:
Diversified Construction
Edelweiss Elementary School - Grand Prairie ISD
Contract Amount:
$1,268,640
Mechanical Designer:
Don Penn & Associates
Architect:
PBK Architects
General Contractor:
Dal Mac Construction
Emma Ousley Junior High
Contract Amount:
$2,048,000
Mechanical Designer:
Maloney Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Buford-Thompson
Ennis Junior High School
Contract Amount:
$2,925,000
Mechanical Designer:
Estes McClure
Architect:
SHW Group
General Contractor:
Charter Builders, Inc.
Completion Date:
May 2009
Eppright Drive Elementary School - Denton ISD
General Contractor:
Balfour Beatty
Contact:
John Heiser
Euless Park Place POB
Contract Amount:
$743,368
Mechanical Designer:
Frank W. Neal & Associates
Architect:
Hahnfeld Associates
General Contractor:
T.W. Gilmore, Inc.
Fannin Elementary School - Grand Prairie ISD
Contract Amount:
$503,330
Mechanical Designer:
Don Penn
Architect:
PBK Architects
General Contractor:
Dal-Mac Construction
Fannin Middle School Renovations - Grand Prairie ISD
Contract Amount:
$2,629,189
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
August 2010
Ferrell Elementary
Contract Amount:
$381,101
Mechanical Designer:
Maloney & Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Component Construction
Fine Arts Academy - White Settlement ISD
Contract Amount:
$1,112,822
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders, Inc.
Completion Date:
August 2009
Florence Elementary School - Keller ISD
Contact:
Chris Goodman
Fort Worth Country Day - Fieldhouse
Contract Amount:
$1,141,000
Mechanical Designer:
Bennet - Benner Partners
Architect:
Baird, Hampton & Brown, Inc.
General Contractor:
Lincoln Builders of Texas, Inc.
Completion Date:
August 2016
Contact:
Bill Jones
Foster Village Elementary - Birdville ISD
Contract Amount:
$365,500
Mechanical Designer:
Don Penn
Architect:
Vestal-Loftis-Kalista
General Contractor:
Century Mechanical
Fowler Middle School - Frisco ISD
Contract Amount:
$1,822,816
Mechanical Designer:
Don Penn Engineers
Architect:
Corgan Associates
General Contractor:
Cadence McShane Corp.
Freedom Elementary - Keller ISD
Contract Amount:
$1,250,593
Mechanical Designer:
Maloney Associates
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Friendship Elementary School - Keller ISD
Contract Amount:
$1,723,241
Mechanical Designer:
Maloney & Associates
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Frisco Admin Concessions
Contract Amount:
$83,387
Mechanical Designer:
Don Penn Engineers
Architect:
SHW Group
General Contractor:
Charter Builders
Frisco Elementary School
Contract Amount:
$625,500
Mechanical Designer:
Sam Toub & Associates
Architect:
Corgan Associates
General Contractor:
The Cadence Group
Frisco High School
Contract Amount:
$1,632,036
Mechanical Designer:
Sam Toub & Associates
Architect:
Corgan Associates
General Contractor:
The Cadence Group
Frisco High School #11
General Contractor:
Core Construction
Contact:
John Heiser
Frisco ISD Administration Annex
Contract Amount:
$484,485
Mechanical Designer:
Don Penn Engineers
Architect:
SHW Group
General Contractor:
Charter Builders
Frisco ISD Elementary #41 (Talley)
Contract Amount:
$2,306,300
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates
General Contractor:
Ratcliff Construction
Completion Date:
June 2017
Contact:
Mike Beebe
Frisco ISD Elementary #42 (Liscano)
Contract Amount:
$2,306,300
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates
General Contractor:
Ratcliff Construction
Completion Date:
June 2017
Contact:
Mike Beebe
FWISD HVAC Upgrade to Administration Building
Contract Amount:
$1,789,000
Mechanical Designer:
Wells Doak Engineering, Inc.
Architect:
Hahnfeld Hofer Stanford
Completion Date:
June 2016
Contact:
Jarod O'Neill
Glenn Harmon Elementary - Mansfield ISD
Contract Amount:
$2,500,000
Mechanical Designer:
Image Engineering Group
Architect:
Huckagee & Associates
General Contractor:
Lee Lewis Construction
Completion Date:
August 2016
Contact:
Mike Beebe
Glenview Elementary
Contract Amount:
$314,400
Mechanical Designer:
Don Penn Associates
Architect:
SHW Group
General Contractor:
Century Mechanical
GPHS Classroom Tower Additions
General Contractor:
Lincoln Builders
GPISD 2012 HVAC and Roof Replacement
Contract Amount:
$2,194,400
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
October 2012
Granbury Middle School East Site
Contract Amount:
$2,074,123
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Huckabee & Associates
General Contractor:
Douglas Barnhart, Inc.
Granbury Middle School West Site
Contract Amount:
$2,074,762
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Huckabee & Associates
General Contractor:
Douglas Barnhart, Inc.
Grand Prairie High School Fieldhouse and Gym Addition
Contract Amount:
$774,000
Mechanical Designer:
Romine, Romine & Burgess, Inc.
Architect:
Corgan Associates
General Contractor:
Lincoln Builders of Texas, Inc.
Contact:
Bill Jones
Grand Prairie ISD Fieldhouse
Contract Amount:
$774,000
Mechanical Designer:
Romine, Romine & Burgess, Inc.
Architect:
Corgan Associates, Inc.
General Contractor:
Lincoln Builders of Texas, Inc.
Contact:
Bill Jones
Grapevine High School
Contract Amount:
$214,479
Mechanical Designer:
Adams, Reid
Architect:
Huppelshueser-Darrow
General Contractor:
KA Sparks Contractor
Grapevine Middle School
Contract Amount:
$3,090,949
Mechanical Designer:
Reed, Wells & Benson
Architect:
VLK Architects
General Contractor:
Cadence-McShane Corp
Griffin Middle School - Frisco ISD
Contract Amount:
$2,276,370
Mechanical Designer:
Don Penn
Architect:
Corgan Associates
General Contractor:
Lee Lewis Construction
Handley Middle School
Contract Amount:
$583,356
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Komatsu & Associates
General Contractor:
Hancon Corporation
Handley Middle School - HVAC Upgrades (FWISD)
Contact:
Jarod O'Neill
Harwood & Nichols J.H.S.
Contract Amount:
$3,234,630
Mechanical Designer:
Lampe - Speck
Architect:
Vestal-Loftis-Kalista
General Contractor:
Dal-Mac, Inc.
Hazel Harvey Peace Elementary School - Fort Worth ISD
Contract Amount:
$1,864,038
Mechanical Designer:
MEP Consultants
Architect:
Hahnfeld Associates
General Contractor:
Thos. S. Byrne, Inc.
Completion Date:
August 2010
HEB Cooling Tower
Contract Amount:
$346,607
Mechanical Designer:
Page-Southerland-Page
Architect:
Page-Southerland-Page
General Contractor:
Ed A. Wilson, Inc.
Hebron High School - Fine Arts Addition (Lewisville ISD)
Architect:
Stantec Architecture, Inc.
General Contractor:
Jackson Construction
Contact:
Chad Kroeker
Heights/McDonald Schools
Contract Amount:
$247,746
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Century Mechanical
General Contractor:
Century Mechanical
Heritage Elementary School - Keller ISD
Contact:
Chris Goodman
Heritage High School - Frisco ISD
Contract Amount:
$7,934,224
Mechanical Designer:
Image Engineering
Architect:
SHW Architects
General Contractor:
Lee Lewis Construction
Completion Date:
August 2009
Hidden Creek Middle School - Burleson ISD
General Contractor:
Jackson Construction
Completion Date:
August 2018
Contact:
Chad Kroeker
Hidden Lakes Elementary - Keller ISD
Contract Amount:
$1,125,257
Mechanical Designer:
Maloney Associates
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Higher Ed Facility Phases 1 & 2 - Burleson ISD
Architect:
Stantec Architecture, Inc.
General Contractor:
Jackson Construction
Contact:
Chad Kroeker
Hillwood Middle School - Keller ISD
Contract Amount:
$595,500
Mechanical Designer:
Image Engineering, Inc.
Architect:
Huckabee
General Contractor:
Steele-Freeman, Inc.
Completion Date:
August 2016
Contact:
Chad Kroeker
Holiday Heights Elementary
Contract Amount:
$255,590
Mechanical Designer:
Don Penn Associates
Architect:
SHW Group
General Contractor:
Century Mechanical
Hollyhock Elementary School #43 - Frisco ISD
Contact:
John Heiser
Hometown Elementary - Birdville ISD
Contract Amount:
$1,314,347
Mechanical Designer:
Image Engineering Group
Architect:
HKS, Inc.
General Contractor:
Key Construction, Inc.
Hughes MS Remodel (BISD)
Mechanical Designer:
Image Engineering Group
Architect:
Stantec Architecture, Inc.
General Contractor:
Cadence McShane Construction
Contact:
Chad Kroeker
Independence Elementary School - Keller ISD
Contract Amount:
$1,723,409
Mechanical Designer:
Maloney & Associates
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Independence High School - Frisco ISD
Contract Amount:
$9,280,994
Mechanical Designer:
IEG Engineers
Architect:
Corgan Associates
General Contractor:
Lee Lewis Construction
Completion Date:
July 2014
Indian Springs Middle School - Keller ISD
Contract Amount:
$1,828,500
Mechanical Designer:
Wells Doak
Architect:
Vestal-Loftis-Kalista
General Contractor:
Steele-Freeman, Inc.
Indian Springs Middle School Addition - Keller ISD
Contract Amount:
$686,640
Mechanical Designer:
Wells Doak
Architect:
Gideon Toal
General Contractor:
Steele Freeman, Inc.
Indoor Extra Curricular Facilities & Agricultural Science Center - Keller ISD
Contact:
Chris Goodman
Irma Marsh Middle School - Additions & Renovations (Castleberry ISD)
Architect:
WRA Architects, Inc.
General Contractor:
Buford-Thompson Company
Contact:
Jarod O'Neill
Isabell Elementary School - Frisco ISD
Contract Amount:
$1,434,000
Mechanical Designer:
Don Penn
Architect:
Corgan Associates
General Contractor:
Hisaw & Associates
J. L. Boren Elementary School - Mansfield ISD
Contract Amount:
$2,471,000
Mechanical Designer:
Image Engineering Group
Architect:
Huckabee & Associates
General Contractor:
Lee Lewis Construction
Completion Date:
July 2014
Jackson Middle School - Grand Prairie ISD
Contract Amount:
$2,286,573
Mechanical Designer:
Don Penn
Architect:
PBK Architects
General Contractor:
Dal-Mac Construction
James Bowie Fine Arts Academy
General Contractor:
Lincoln Builders of Texas
Contact:
Bill Jones
Jimmy and Sammy Vaughn Elementary - Frisco ISD
Contract Amount:
$2,252,816
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates Inc.
General Contractor:
Cadence McShane Corporation
Completion Date:
August 2016
Contact:
Mike Beebe
Keller CTE High School - Keller ISD
Contract Amount:
$4,125,120
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates Inc.
General Contractor:
Steele-Freeman, Inc.
Completion Date:
December 2016
Contact:
Chad Kroeker
Keller Elementary #23 Keller ISD
Contract Amount:
$2,423,250
Mechanical Designer:
Image Engineering Group, Ltd.
Architect:
Corgan Associates, Inc.
General Contractor:
Steele-Freeman, Inc.
Completion Date:
August 2016
Contact:
Chad Kroeker
Keller High School Kitchen Renovations
Contract Amount:
$441,141
Mechanical Designer:
Wells Doak
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Keller Middle School
Contract Amount:
$346,640
Mechanical Designer:
Byron Folse Architects
Architect:
Byron Folse Architects
General Contractor:
R. C. Small & Associates
Keller Middle School - Additions & Renovations
General Contractor:
BTC
Contact:
Chris Goodman
Keller Middle School - Additions & Renovations
Architect:
VLK Architects, Inc.
General Contractor:
BTC
Contact:
Chris Goodman
Keller Middle School - Keller ISD
Contract Amount:
$1,135,870
Mechanical Designer:
Dale Caffey
Architect:
ARB Architects
General Contractor:
Steele-Freeman, Inc.
Kirby Elementary School - Grand Prairie ISD
Contract Amount:
$1,268,640
Mechanical Designer:
Don Penn & Associates
Architect:
PBK Architects
General Contractor:
Dal Mac Construction
Lady Bird Johnson Middle School - Irving ISD
Contract Amount:
$4,073,906
Mechanical Designer:
Image Engineering Group
Architect:
Corgan Associates
General Contractor:
Charter Builders
Completion Date:
August 2011
Lake Dallas Athletic Complex
Contract Amount:
$845,593
Mechanical Designer:
Don Penn
Architect:
Darrow,McSpedden.Sellars
General Contractor:
Lee Lewis Construction
Lake Dallas Middle School
Contract Amount:
$3,100,818
Mechanical Designer:
Don Penn
Architect:
DMS Architects
General Contractor:
Lee Lewis Construction
Lake Ridge High School - Mansfield ISD
Contract Amount:
$8,696,938
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lee Lewis Construction
Completion Date:
August 2012
Lamar High School
Contract Amount:
$1,735,800
Mechanical Designer:
Friberg & Associates
Architect:
Corgan Associates
General Contractor:
Lee Lewis Construction
Larson Elementary
Contract Amount:
$1,221,500
Mechanical Designer:
Maloney Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Charter Builders
LaRue Miller Elementary School - Midlothian ISD
Contract Amount:
$2,124,746
Mechanical Designer:
Estes McClure
Architect:
HKS Architects
General Contractor:
Satterfield & Pontikes
Completion Date:
March 2009
Lee Elementary School - HVAC Upgrades
Architect:
Estes, McClure & Associates
General Contractor:
Lincoln Builders of Texas, Inc.
Contact:
Bill Jones
Lee Middle School - Grand Prairie ISD
Contract Amount:
$375,570
Mechanical Designer:
Don Penn
Architect:
PBK Architects
General Contractor:
Dal-Mac Construction
Liberty Elementary School - Keller ISD
Contract Amount:
$1,734,474
Mechanical Designer:
Baird, Hampton, Brown
Architect:
Hahnfeld, Hoffer, Stanford
General Contractor:
Steele Freeman, Inc.
Liberty Elementary School - White Settlement ISD
Contract Amount:
$862,294
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders, Inc.
Liberty High School Frisco ISD
Contract Amount:
$6,994,035
Mechanical Designer:
Image Group (Don Penn)
Architect:
SHW Architects
General Contractor:
Charter Builders, Inc.
Completion Date:
October 2008
Liberty Hills Middle School #3
Architect:
PBK
General Contractor:
Bartlett Cocke General Contractors
Contact:
Chad Kroeker
Life High School - Waxahachie, Texas
Contract Amount:
$4,206,000
Mechanical Designer:
DFW Consulting
Architect:
Beck Architecture
General Contractor:
Beck Group
Completion Date:
September 2015
Lone Star Elementary - Frisco ISD
Contract Amount:
$1,435,800
Mechanical Designer:
Don Penn
Architect:
Corgan Associates
General Contractor:
Hisaw & Associates
Lone Star Elementary School - Keller ISD
Contract Amount:
$1,126,183
Mechanical Designer:
Maloney Associates
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Lone Star High School - Frisco ISD
Contract Amount:
$6,447,572
Mechanical Designer:
Image Engineering
Architect:
SHW Architects
General Contractor:
Hunt Construction Group
Completion Date:
August 2009
Martinez Intermediate School - Mansfield ISD
Architect:
Huckabee, Inc.
General Contractor:
Lee Lewis Construction, Inc.
Contact:
John Heiser
Mary Moore Elementary
Contract Amount:
$850,000
Mechanical Designer:
Multatech Engineering
Architect:
Wharton & Lam
General Contractor:
RE Hable Co.
Mary Moore Elementary
Contract Amount:
$676,615
Mechanical Designer:
LBL Architects
Architect:
LBL Architects
General Contractor:
Westland Construction
McCarroll Middle School - Decatur ISD
Contract Amount:
$686,004
Mechanical Designer:
Engineering Associates
General Contractor:
Century Mechanical
Completion Date:
August 2012
McKinney Education Facility - Frisco ISD
Architect:
Huckabee & Associates
General Contractor:
Core Construction
Contact:
John Heiser
Milam Elementary School - Grand Prairie ISD
Contract Amount:
$1,830,000
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
August 2013
Mullendore Elementary
Contract Amount:
$241,164
Mechanical Designer:
Don Penn & Associates
Architect:
Robert Graham with BISD
General Contractor:
Component Construction
New Coppell Middle School East
Mechanical Designer:
Image Engineering Group
Architect:
CORGAN
Contact:
John Heiser
New Coppell Middle School West
General Contractor:
Northstar Builders Group, Inc.
Contact:
Mike Beebe
New Denton High School
Contact:
Chad Kroeker
New Eagle Mountain - Saginaw High School
Architect:
VLK Architects, Inc.
General Contractor:
Core Construction
Contact:
Chad Kroeker
Ninth Grade Center - Grand Prairie ISD
Contract Amount:
$2,795,367
Mechanical Designer:
Don Penn
Architect:
PBK Architects
General Contractor:
Dal-Mac Construction
North Crowley High School - Indoor Practice Facility
General Contractor:
Steele & Freeman, Inc.
Contact:
Chad Kroeker
North Euless Elementary - HEB ISD
Contract Amount:
$641,163
Mechanical Designer:
Turner Engineers
Architect:
Hahnfeld Associates
General Contractor:
Steele-Freeman, Inc.
North Oaks Middle School - Birdville ISD
Contract Amount:
$220,000
Mechanical Designer:
Don Penn
Architect:
SHW Group
General Contractor:
Component Construction
North Richland Middle School
Contract Amount:
$448,895
Mechanical Designer:
Don Penn & Associates
Architect:
Don Penn & Associates
General Contractor:
Century Mechanical
North Riverside Elementary School - Keller ISD
Contract Amount:
$1,024,000
Mechanical Designer:
Maloney Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Steele and Freeman Inc.
Northwest ISD - Administration Building
Architect:
EMA Engineering & Consultants, Inc.
General Contractor:
Century Mechanical Contractors, Inc.
Contact:
Jarod O'Neill
Northwest ISD - Eaton HS, Wilson MS & Tidwell HS Additions & Renovations
General Contractor:
BTC
Contact:
Jarod O'Neill
Norwood Elementary School - Mansfield ISD
Architect:
Huckabee, Inc.
General Contractor:
Lee Lewis Construction, Inc.
Contact:
John Heiser
O.H. Stowe Elementary - Birdville ISD
Contract Amount:
$345,500
Mechanical Designer:
Don Penn
Architect:
SHW Group
General Contractor:
Century Mechanical
Parkwood Hill Intermediate School - Keller ISD
Contract Amount:
$579,500
Mechanical Designer:
Image Engineering Group, Ltd.
Architect:
Huckabee
General Contractor:
Steele-Freeman, Inc.
Completion Date:
August 2016
Contact:
Chad Kroeker
Patricia Dean Boswell McCall Elementary School - Aledo ISD
Contract Amount:
$2,061,677
Mechanical Designer:
Image Engineering
Architect:
VLK Architects
General Contractor:
Buford Thompson Company
Completion Date:
December 2008
Peaster Elementary
Contract Amount:
$562,200
Mechanical Designer:
Leon R. Biddy
Architect:
Harper, Perkins Architects
General Contractor:
Westland Construction
Performing Arts - Northewst ISD
Contract Amount:
$977,700
Mechanical Designer:
Baird Hampton Brown
Architect:
Hahnfeld Associates
General Contractor:
Buford-Thompson, Inc.
Perrin Elementary School (Northwest ISD)
Architect:
Huckabee & Associates
General Contractor:
Pogue Construction
Contact:
Jarod O'Neill
Peter's Colony Elementary School - Lewisville ISD
Contract Amount:
$1,919,864
Mechanical Designer:
Estes McClure & Associates
Architect:
SHW Group
General Contractor:
Charter Builders
Completion Date:
August 2010
Pink Elementary - Frisco ISD
Contract Amount:
$1,435,800
Mechanical Designer:
Don Penn
Architect:
Corgan Associates
General Contractor:
Hisaw & Associates
Prosper High School
General Contractor:
Pogue Construction
Contact:
Jarod O'Neill
REALM Secondary School - Burleson ISD
Contact:
Chad Kroeker
Red Oak High School
Contract Amount:
$7,252,079
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Cadence McShane Corp
Completion Date:
July 2010
Rick Reedy High School - Frisco ISD
Contract Amount:
$10,247,990
Mechanical Designer:
Image Engineering Group
Architect:
SHW Group
General Contractor:
Lee Lewis Construction
Completion Date:
August 2015
Contact:
Mike Beebe
Riddle Elementary School - Frisco ISD
Contract Amount:
$981,128
Mechanical Designer:
Don Penn
Architect:
Corgan Associates
General Contractor:
Cadence McShane Corp.
Ridgeview Elementary School - Keller ISD
Contract Amount:
$2,535,358
Mechanical Designer:
Reed, Wells Benson
Architect:
VLK Architects
General Contractor:
Steele Freeman Inc
Completion Date:
August 2011
Roach Middle School - Frisco ISD
Contract Amount:
$1,730,132
Mechanical Designer:
Don Penn Engineers
Architect:
Corgan Associates
General Contractor:
Charter Builders
S Grand Prairie HS School Coliseum & Band Hall - Grand Prairie ISD
Contract Amount:
$730,494
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
October 2012
Sam Houston High School
Contract Amount:
$196,688
Mechanical Designer:
Friberg, Alexander, Maloney, Gipson & Weir
Architect:
Wharton & Lam
General Contractor:
Cadenhead-Rangaire, Inc.
Sanger High School
Contract Amount:
$2,420,000
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Huckabee & Associates
General Contractor:
Plyler Construction
Scoggins Middle School - Frisco ISD
Contract Amount:
$2,155,673
Mechanical Designer:
Image Engineering
Architect:
Corgan Associates
General Contractor:
Hisaw & Associates
Completion Date:
August 2009
Seven Hills Elementary School - NWISD
Architect:
Huckabee & Associates
General Contractor:
Pogue Construction
Contact:
Jarod O'Neill
Shady Shores Elementary - Lake Dallas ISD
Contract Amount:
$2,149,591
Mechanical Designer:
Don Penn Engineers
Architect:
DMS Architects
General Contractor:
Lee Lewis Construction
Sherman High School - Sherman ISD
Architect:
VLK Architects, Inc.
General Contractor:
Cadence McShane
Contact:
Jarod O'Neill
Silo Road Elementary
Contract Amount:
$1,247,700
Mechanical Designer:
Maloney & Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Mitchell Enterprises
Skyline M&O Office Building - Grand Prairie ISD
Contract Amount:
$131,000
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
September 2011
Smithfield Middle School
Contract Amount:
$907,750
Mechanical Designer:
Don Penn & Associates
Architect:
SHW Group
General Contractor:
Component Construction
Smithfield Middle School - Birdville ISD
Contract Amount:
$483,343
Mechanical Designer:
IEG
Architect:
HKS Architects
General Contractor:
Modern Contractors
South Arlington Catholic School
Contract Amount:
$305,500
Mechanical Designer:
Sam Toub & Associates
Architect:
Corgan Associates
General Contractor:
Buford-Thompson
South Grand Prairie High School Auditorium Addition
Contract Amount:
$1,147,496
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
Lincoln Builders
Completion Date:
August 2010
Speers Elementary
Contract Amount:
$718,878
Mechanical Designer:
Wells-Doak
Architect:
O'Brien Partnership
General Contractor:
Coronado Builders
St. Martin de Porres Catholic School
Contact:
John Heiser
Stafford Middle School - Frisco ISD
Contract Amount:
$3,014,447
Mechanical Designer:
Image Engineering
Architect:
Corgan Associates
General Contractor:
Charter Builders, Inc.
Completion Date:
May 2009
Staley Middle School Field House - Frisco ISD
Contract Amount:
$120,000
Mechanical Designer:
Don Penn
Architect:
SHW Architects
General Contractor:
Charter Builders
Tarleton State University - Convocation Center
Contact:
Jarod O'Neill
Tarver Renden Elementary - Mansfield ISD
Contract Amount:
$2,288,000
Mechanical Designer:
IEG Engineers
Architect:
Huckabee & Associates
General Contractor:
Lee Lewis Construction
Completion Date:
August 2013
TCJC SE Campus
Contract Amount:
$5,221,901
Mechanical Designer:
Friberg Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Thos. S. Byrne, Inc.
TCU Alumni Center
Contract Amount:
$346,640
Mechanical Designer:
Freese & Nichols
Architect:
Lockwook, Andrews, Neuman
General Contractor:
Linbeck Construction
Timber Creek High School - Keller ISD
Contract Amount:
$11,044,642
Mechanical Designer:
Image Engineering
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Completion Date:
December 2009
Timber Oaks Elementary
Contract Amount:
$1,247,700
Mechanical Designer:
Maloney & Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Mitchell Enterprises
Timberview Middle School - Keller ISD
Contract Amount:
$4,150,759
Mechanical Designer:
Baird Hampton Brown
Architect:
Hahnfeld Hoffer Stanford
General Contractor:
Steele Freeman Inc.
Completion Date:
August 2010
Travis Elementary Restoration - Grand Prairie ISD
Contract Amount:
$249,620
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Corgan Associates
General Contractor:
LIncoln Builders
Completion Date:
August 2010
Trinity Meadows Intermediate School - Keller ISD
Contract Amount:
$1,864,553
Mechanical Designer:
Baird, Hampton, Brown
Architect:
Hahnfeld Associates
General Contractor:
Steele Freeman, Inc.
Trinity Springs Middle School - Keller ISD
Contract Amount:
$2,573,152
Mechanical Designer:
Image Group (Don Penn)
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Trinity Springs Middle School Addition - Keller ISD
Contract Amount:
$686,206
Mechanical Designer:
Image Engineering
Architect:
VLK Architects
General Contractor:
Steele Freeman, Inc.
Completion Date:
July 2009
Valley Creek Middle School Additions - Lewisville ISD
Architect:
Stantec Architecture, Inc.
General Contractor:
Jackson Construction
Contact:
Chad Kroeker
Van Zandt-Guinn Elementary
Contract Amount:
$377,727
Mechanical Designer:
Adams, Reid
Architect:
Hahnfeld Associates
General Contractor:
Cadenhead-Rangaire, Inc.
Vista Ridge Middle School- Keller ISD
Contract Amount:
$4,113,650
Mechanical Designer:
Reed Wells Benson
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Completion Date:
August 2017
Contact:
Chad Kroeker
Walnut Grove Elementary - Carroll ISD
Contract Amount:
$2,386,000
Mechanical Designer:
Romine, Romine & Burgess
Architect:
Natex Architects
General Contractor:
AUI Contractors, Inc.
Completion Date:
August 2011
Watauga Elementary
Contract Amount:
$255,590
Mechanical Designer:
Don Penn Associates
Architect:
SHW Group
General Contractor:
Century Mechanical
Wayside Middle School
Contract Amount:
$612,207
Mechanical Designer:
Friberg Associates
Architect:
Friberg Associates
General Contractor:
Century Mechanical
West Early Learners Academy - White Settlement ISD
General Contractor:
BTC
Contact:
Chris Goodman
West Elementary
Contract Amount:
$1,221,500
Mechanical Designer:
Maloney Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Charter Builders
West Hurst Elementary - HEB ISD
Contract Amount:
$661,169
Mechanical Designer:
Turner Engineers
Architect:
Hahnfeld Associates
General Contractor:
Steele-Freeman, Inc.
West Middle School - Northwest ISD
Contract Amount:
$1,163,000
Mechanical Designer:
K-12 Design
Architect:
K-12 Design
General Contractor:
Diversified Construction
Whitley Road Elementary School - Keller ISD
Contact:
Chad Kroeker
Wichita Falls Memorial High School
Architect:
Huckabee & Associates
General Contractor:
Bartlett Cocke General Contractors
Contact:
Jarod O'Neill
Wilkinson Middle School #18 - Frisco ISD
Architect:
Corgan
General Contractor:
Joeris General Contractors
Contact:
John Heiser
Williams Elementary
Contract Amount:
$317,700
Mechanical Designer:
Maloney & Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Component Construction
Willis Lane Elementary
Contract Amount:
$1,076,132
Mechanical Designer:
Maloney Associates
Architect:
Vestal-Loftis-Kalista
General Contractor:
Pete Durant & Associates
Wimbish Elementary
Contract Amount:
$711,195
Mechanical Designer:
Wells-Doak
Architect:
O'Brien Partnership
General Contractor:
Coronado Builders
Woodland Springs Elementary School - Keller ISD
Contract Amount:
$1,585,835
Mechanical Designer:
Maloney Associates
Architect:
VLK Architects
General Contractor:
Steele-Freeman, Inc.
Young Junior High School
Contract Amount:
$1,024,823
Mechanical Designer:
Love, Friberg
Architect:
Geren Associates
General Contractor:
Walker Construction Co.
Zan Wesley Holmes Jr. Middle School - Dallas ISD
Contract Amount:
$5,793,823
Mechanical Designer:
Barsharkhah Engineering
Architect:
Perkins Will
General Contractor:
Rogers-O'Brien Construction
Completion Date:
May 2012